Skip to content

Draft documents. Drafts must be reviewed by a competent person. Not affiliated with OSHA. Read the disclaimer

JHABox
Menu

Built around OSHA 29 CFR 1926 · English + Español

A JHA your GC will accept, built in 2 minutes.

Pick your trade, describe the job, and get a Job Hazard Analysis with job steps, hazards, controls, risk ratings and real 29 CFR 1926 references. Laid out the way GC safety reviewers read them. You check it, a competent person signs it.

First watermarked draft free. $9 per document after, Spanish included.

Job Hazard Analysis

JHA · Roofing · Tampa, FL

DRAFT
#Job stepBeforeAfter
Building hazard table…
Building hazard table…Join the waitlist

How it works

Three steps from “send me your JHA” to a signed sheet.

01

Pick the trade

Each of the 10 trades has its own hazard library: steps, hazards, controls and citations. Roofing isn't a copy of electrical.

02

Describe the job

Site address, company, GC, date, crew size and what you're actually doing. Mention a trench, a boom lift or storm damage and the right steps get added.

03

Review, sign, brief

Download the PDF. A competent person checks it against the site and signs it, then the crew signs the sign-off sheet at the pre-task briefing.

What’s in every JHA

A real document, not a chat reply.

These are actual pages rendered from the current JHABox template (a sample roofing JHA). US Letter landscape, prints cleanly in black and white. Download the same content as an editable Word file.

  1. 1Job information & sign-off lines
  2. 2Required PPE grid
  3. 3Training, permits & equipment checklist
  4. 4Hazard table: steps, hazards, controls
  5. 5Control-type tags: ELIM · SUBST · ENG · ADMIN · PPENew
  6. 6Risk before and after (3×3 matrix)
  7. 729 CFR 1926 reference for each step
  8. 8Equipment / training / inspection tableNew
  9. 9Emergency info, rescue & heat plan
  10. 10Revision logNew
  11. 11Crew sign-off with roles + phone QRNew
  12. 12Editable Word (.docx) copyNew
Every control is tagged:ELIMSUBSTENGADMINPPE
Sample JHA page 1: job information, required PPE grid and training checklist
Sample JHA page 2: hazard analysis table with risk ratings, control-type tags and 29 CFR 1926 references
Sample JHA page 4: risk matrix key, emergency information and the equipment, training and inspection table
Equipment / training / inspection
Sample JHA page 5: crew sign-off sheet with name and role columns, phone sign-off QR code and revision log
Sign-off roles, QR & revision log

Crew sign-off

Brief the crew, get every signature.

Every JHA ends with a printable sign-off sheet: name, role, signature, company and date for each worker, plus a “reviewed with crew by” block and a revision log.

Or skip the clipboard: the QR code opens a phone page with the steps and key hazards. Each worker enters name and role, ticks “I have read and understood this JHA” and signs with a finger or typed name.

  • Phone sign-off behind the QR
  • Paper sheet still prints
  • Same sheet in Spanish

Spanish included

Español incluido. Sin costo extra.

The whole JHA in Spanish: hazards, controls, PPE, emergency plan and sign-off sheet. Other tools charge extra or keep it for top tiers; with JHABox it's in every paid document.

EN

Install roof anchors and fall protection

Anchors rated 5,000 lb per worker or designed by a qualified person

ES

Instalar anclajes de techo y protección anticaídas

Anclajes de 5,000 lb por trabajador o diseñados por una persona calificada

Compare

Consultant quality is expensive. Blank templates are slow.

Safety consultantBlank / free templateJHABox
Price per JHA$145–$350*Free$9 (first draft free)
Turnaround24–72 hours*However long it takes youAbout 2 minutes
Trade-specific hazards & controlsYesYou write themYes, 10 trade libraries
29 CFR 1926 referencesUsuallyYou look them upYes, checked against eCFR
Spanish versionOften extraRarelyIncluded
Crew sign-off sheetVariesSometimesIncluded, plus phone sign-off
Editable Word fileSometimesYesYes (.docx)
Competent-person reviewDone by the consultantYouYou (always required)

*Published prices for human-written JHAs as of Oct 2026: Progressive Safety $145 (72-hour or 24-hour rush), OccuPros $350 per JHA. Free templates: OSHA’s own JHA template and worksheet.

Pricing

Simple. In US dollars.

Full pricing details →

Free draft

$0up to 5 a day

  • ✓Full JHA drafts for any trade
  • ✓English or Spanish
  • ✓Watermarked “DRAFT – UNPAID” PDF + Word
  • ✓Crew sign-off sheet included
Join the waitlist
Best for a single job

Per document

$9per JHA

  • ✓Clean PDF, no watermark
  • ✓English and Spanish versions
  • ✓Crew sign-off sheet with QR
  • ✓Editable Word file (.docx)
  • ✓2 regenerations

Unlimited

$29per month

  • ✓Unlimited JHAs, every trade
  • ✓Fair use: up to 30 documents a day
  • ✓English and Spanish
  • ✓Cancel anytime

Unlimited yearly

$290per year

  • ✓Everything in Unlimited
  • ✓Fair use: up to 30 documents a day
  • ✓One invoice a year

FAQ

Straight answers.

Not affiliated with OSHA. Not legal advice. Always reviewed by a competent person.

Will my GC accept a JHABox JHA?

We can't promise that, and nobody honestly can. What we do is lay the JHA out the way GC safety reviewers expect: job steps in sequence, hazards, controls, risk before and after, 29 CFR 1926 references, PPE, emergency info and a crew sign-off sheet. A competent person still has to review it for your site.

Does a JHABox draft guarantee I pass an OSHA inspection?

No. No document does that on its own, and JHABox is not affiliated with OSHA. Drafts are built around OSHA 29 CFR 1926 and cite specific paragraphs we've checked against the official eCFR text. Compliance depends on what happens on site.

Does OSHA require a JHA?

Federal OSHA has no construction standard that requires a document called a JHA, but GCs, owners and USACE (as an Activity Hazard Analysis) often do. Read our guide: Is a JHA required by OSHA?

What do I get for free?

Complete drafts for any of our 10 trades (up to 5 a day under fair use), in English or Spanish, as a PDF or editable Word file watermarked "DRAFT – UNPAID". It's the same document you'd pay for, so you can judge it properly.

Is Spanish really included?

Yes. The whole document, including the hazard table and crew sign-off sheet, comes out in Spanish. A paid document includes both languages at no extra cost.

What happens to my job details?

Generated drafts, Word files and phone sign-offs are stored only so you can download and sign them, and are deleted automatically after 30 days. See the draft privacy policy.

Your GC wants a JHA by tomorrow. You’ll have a draft in two minutes.

Join the waitlist

Draft only. Every JHA is a draft and must be reviewed by a competent person for the specific site before work begins. JHABox is not affiliated with OSHA or the U.S. Department of Labor.