Electrical JHA: job hazard analysis example and generator
An electrical JHA starts with identifying the circuits, then de-energizing and tagging them out. It then covers testing for absence of voltage, rough-in, terminations and re-energizing. The core references are in 29 CFR 1926 Subpart K, including 1926.416 (protection of employees) and 1926.417 (lockout and tagging of circuits).
Draft only. Every JHA is a draft and must be reviewed by a competent person for the specific site before work begins. JHABox is not affiliated with OSHA or the US Department of Labor.
General contractors (GCs) ask for written JSAs (job safety analyses) on electrical startup, shutdown, and panel entry. A good electrical JHA shows who locks out, where the tags go, and how you prove a circuit is dead before anyone touches it.
Common electrical hazards
- Shock and electrocution from circuits thought to be dead
- Arc flash during testing and panel work
- Back-feed from generators and solar
- Falls from ladders and lifts
- Concealed conductors when drilling or cutting
Sample electrical hazard table
Sample from the JHABox electrical library. Example task: “Panel replacement and branch circuit rough-in, occupied house” at a Florida address. Showing 5 of 11 steps.
Swipe sideways to see the full table.
| # | Job step | Potential hazards | Risk before controls | Controls | Risk after controls | 29 CFR reference |
|---|---|---|---|---|---|---|
| 1 | Identify circuits and nearby energized parts |
| HHigh |
| MMedium | |
| 2 | De-energize, lock out and tag out |
| HHigh |
| MMedium | |
| 3 | Test for absence of voltage |
| HHigh |
| MMedium | |
| 4 | Ladder access and use |
| HHigh |
| MMedium | |
| 5 | Conduit, boxes and wire pulling |
| MMedium |
| LLow |
Risk = Severity × Likelihood on a 3×3 matrix (1–2 Low, 3–4 Medium, 6–9 High). Citations link to the Electronic Code of Federal Regulations (eCFR).
Relevant 29 CFR 1926 subparts
Key paragraphs we cite
- 1926.416(a)(1)No work near a circuit unless it is de-energized and grounded, or guarded
- 1926.416(a)(3)Find out where energized circuits are before work begins
- 1926.417(b)De-energized equipment rendered inoperative and tagged at every energizing point
- 1926.404(b)(1)(i)Ground-fault circuit interrupter (GFCI), or an assured equipment grounding conductor program
Checked against the eCFR (Title 29, as amended through October 14, 2026). Confirm the current text, and any state plan rules that apply to your site.
Florida job sites
Florida: storm restoration and generators
After hurricanes, portable and standby generators create back-feed risk on circuits that should be dead. JHABox electrical drafts include a back-feed check in the lockout step. Storm-damage tasks add a walk-down step that treats every downed line as energized.
Electrical JHA FAQ
Does OSHA require a written electrical JHA?
Federal OSHA has no construction standard that requires a document called a “JHA” (job hazard analysis). You still have to meet the specific 29 CFR 1926 standards for the work and run the accident-prevention program in 1926.20(b). General contractors (GCs), owners, and the US Army Corps of Engineers (USACE) often require one. USACE calls it an Activity Hazard Analysis.
Which OSHA standard covers lockout/tagout on construction sites?
In construction, 1926.417 requires controls to be tagged, de-energized equipment to be rendered inoperative and tagged at all points where it can be energized, and tags to plainly identify the equipment or circuit.
Can I hand this straight to my general contractor?
Not without review. Every JHABox document is a draft. A competent person (someone who can identify the hazards and is authorized to correct them) has to check it for that site, adjust it to real conditions, and sign it before work starts. JHABox is not affiliated with OSHA.
Is the Spanish version included?
Yes. Pick Spanish on the build form and the whole document comes out in Spanish, including the hazard table, personal protective equipment (PPE) list, and crew sign-off sheet. A paid document includes both languages.
Get your electrical JHA draft
Built for your site, your crew, and your general contractor (GC). English or Spanish. Up to 5 watermarked drafts a day are free.
Join the waitlist