A masonry JHA starts with setting up the limited access zone and handling materials. It then covers masonry scaffolds, cutting block and brick (a silica hazard), laying and bracing walls, power tools and cleanup. The references are 1926.706 in Subpart Q, Subpart L for scaffolds and 1926.1153 for silica.
Draft only. Every JHA is a draft and must be reviewed by a competent person for the specific site before work begins. JHABox is not affiliated with OSHA or the US Department of Labor.
General contractors (GCs) list masonry among the tasks that need a written JSA (job safety analysis). The two items they look for are the limited access zone and the wall bracing plan.
Common masonry hazards
- Wall collapse onto workers
- Falls from masonry scaffolds
- Silica dust when cutting block
- Back injuries from lifting block
- Cement burns from mortar
Sample masonry hazard table
Sample from the JHABox masonry library. Example task: “8-inch concrete block (CMU) wall, 12 ft high, cut block on site” at a Florida address. Showing 5 of 9 steps.
Swipe sideways to see the full table.
| # | Job step | Potential hazards | Risk before controls | Controls | Risk after controls | 29 CFR reference |
|---|---|---|---|---|---|---|
| 1 | Set up the limited access zone |
| HHigh |
| MMedium | |
| 2 | Material handling: block, brick and mortar |
| HHigh |
| LLow | |
| 3 | Erect and work from masonry scaffold |
| HHigh |
| MMedium | |
| 4 | Cutting block and brick (silica) |
| HHigh |
| MMedium | |
| 5 | Lay walls and brace |
| HHigh |
| MMedium |
Risk = Severity × Likelihood on a 3×3 matrix (1–2 Low, 3–4 Medium, 6–9 High). Citations link to the Electronic Code of Federal Regulations (eCFR).
Relevant 29 CFR 1926 subparts
Key paragraphs we cite
- 1926.706(a)Limited access zone whenever a masonry wall is being built
- 1926.706(b)Brace walls over 8 ft until permanently supported
- 1926.1153(c)(1)OSHA Table 1 controls for cutting with masonry saws
- 1926.451(f)(3)A competent person (someone who can identify the hazards and is authorized to correct them) inspects the scaffold before each shift
Checked against the eCFR (Title 29, as amended through October 14, 2026). Confirm the current text, and any state plan rules that apply to your site.
Florida job sites
Florida: block walls and storm winds
Florida builds a lot of concrete masonry unit (CMU) block walls, and an unbraced wall in a summer squall is a collapse risk. JHABox masonry drafts include a wind-monitoring control and a rule to clear the limited access zone in high winds.
Masonry JHA FAQ
Does OSHA require a written masonry JHA?
Federal OSHA has no construction standard that requires a document called a “JHA” (job hazard analysis). You still have to meet the specific 29 CFR 1926 standards for the work and run the accident-prevention program in 1926.20(b). General contractors (GCs), owners, and the US Army Corps of Engineers (USACE) often require one. USACE calls it an Activity Hazard Analysis.
How big is a masonry limited access zone?
Under 1926.706(a)(2), the limited access zone equals the height of the wall to be built plus four feet, and runs the entire length of the wall, on the side without the scaffold.
Can I hand this straight to my general contractor?
Not without review. Every JHABox document is a draft. A competent person (someone who can identify the hazards and is authorized to correct them) has to check it for that site, adjust it to real conditions, and sign it before work starts. JHABox is not affiliated with OSHA.
Is the Spanish version included?
Yes. Pick Spanish on the build form and the whole document comes out in Spanish, including the hazard table, personal protective equipment (PPE) list, and crew sign-off sheet. A paid document includes both languages.
Get your masonry JHA draft
Built for your site, your crew, and your general contractor (GC). English or Spanish. Up to 5 watermarked drafts a day are free.
Join the waitlist